Comments
1 comment
-
I have this problem too but in vs2003. I switch backwards and forwards between enterprise manager and vs2003 and the table changes are not automatically picked up. Would be great if there was some sort of manual refresh facility for times like this where the tool can rescan it's table lists.
Like the tool but find the autocomplete can be quite irritating when it leaves characters at the end you have to delete manually if ctrl+space pressed mid word to finish it off.
I do understand that this sort of thing is in your list of future changes though.
Thanks
Jon
Add comment
Please sign in to leave a comment.
Basically all db scripts edit windows have code completion for the first db project assigned under the solution and the connection in the list is showing the name of the solution and not the name of the DB project.
Does sql prompt support multiple db projects in a single solution?