Hi Guys,

The "Job duration unusual" alert includes job failures in the baseline. For the purposes of this alert wouldn't it make more sense to ignore these failures when calculating the baseline?

I've got a job that had a bunch of failures that is now raising an alert because it includes the failed job times.

Cheers,

Rhys
Rhys
0

Comments

1 comment

  • priyasinha
    Hi,

    Thanks for your post.

    This was the behaviour in V 2.0.

    But later when we changed the implementation of "Job duration unusual" alert to make it more clear, removing "job failures" from baseline calculation became more difficult. For now, I have logged this as SRP-3498.

    Thanks,
    Priya
    priyasinha
    0

Add comment

Please sign in to leave a comment.