Hi Guys,
The "Job duration unusual" alert includes job failures in the baseline. For the purposes of this alert wouldn't it make more sense to ignore these failures when calculating the baseline?
I've got a job that had a bunch of failures that is now raising an alert because it includes the failed job times.
Cheers,
Rhys
The "Job duration unusual" alert includes job failures in the baseline. For the purposes of this alert wouldn't it make more sense to ignore these failures when calculating the baseline?
I've got a job that had a bunch of failures that is now raising an alert because it includes the failed job times.
Cheers,
Rhys